Close

    Current Notices

    Filter Past Current Notices
    Current Notices
    Title Description Start Date End Date File
    Time-extension to Solar PV/ Solar PV-wind hybrid power projects bid out on or after 10.04.2021(29/12/2022, 69kb, PDF)

    Time-extension to Solar PV/ Solar PV-wind hybrid power projects bid out on or after 10.04.2021(29/12/2022, 69kb, PDF)

    29/12/2022 29/01/2023 View (68 KB) Download
    Time-extension to Solar PV Power Projects under Tranche-III of CPSU Scheme Phase II (Government Producer Scheme), implemented by IREDA(27/12/2022, 383 kb, PDF)

    Time-extension to Solar PV Power Projects under Tranche-III of CPSU Scheme Phase II (Government Producer Scheme), implemented by IREDA

    27/12/2022 27/01/2023 View (375 KB) Download
    Time-extension to Solar PV Power Projects under Tranche-I and Tranche-II of CPSU Scheme Phase II (Government Producer Scheme), implemented by SECI(27/12/2022, 382 kb, PDF)

    Time-extension to Solar PV Power Projects under Tranche-I and Tranche-II of CPSU Scheme Phase II (Government Producer Scheme), implemented by SECI

    27/12/2022 27/01/2023 View (374 KB) Download
    Corrigendum 5: Supply, Installation and Commissioning of Integrated Floating buoy for mounting Offshore Lidar together with meteorological and oceanographic sensors (Wave, Current etc.,) at three locations (Zone C1, Zone B1 & Zone E2) at Gulf of Mannar off, Tamil Nadu Coast in India(23/12/2022,494 Kb, PDF)

    Corrigendum 5: Supply, Installation and Commissioning of Integrated Floating buoy for mounting Offshore Lidar together with meteorological and oceanographic sensors (Wave, Current etc.,) at three locations (Zone C1, Zone B1 & Zone E2) at Gulf of Mannar off, Tamil Nadu Coast in India

    23/12/2022 23/01/2023 View (483 KB) Download
    Corrigendum 6: Supply, Installation and Commissioning of Integrated Floating buoy for mounting Offshore Lidar together with meteorological and oceanographic sensors (Wave, Current etc.,) at three locations (Zone C1, Zone B1 & Zone E2) at Gulf of Mannar off, Tamil Nadu Coast in India(23/12/2022,1.2 mb, PDF)

    Corrigendum 6: Supply, Installation and Commissioning of Integrated Floating buoy for mounting Offshore Lidar together with meteorological and oceanographic sensors (Wave, Current etc.,) at three locations (Zone C1, Zone B1 & Zone E2) at Gulf of Mannar off, Tamil Nadu Coast in India

    23/12/2022 23/01/2023 View (1 MB) Download
    CODE OF PRACTICE FOR DESIGN CONSTRUCTION INSTALLATION AND OPERATION OF BIOGAS (BIOMETHANE) PLANT (19/12/2022, 615kb, PDF )

    CODE OF PRACTICE FOR DESIGN CONSTRUCTION INSTALLATION AND OPERATION OF BIOGAS (BIOMETHANE) PLANT

    19/12/2022 19/01/2023 View (601 KB) Download
    Technical Specification of flexi-biogas plants(19/12/2022, 6.8mb, PDF)

    Technical Specification of flexi-biogas plants

    19/12/2022 19/01/2023 View (6 MB) Download
    Suggestions for Campaign for MNRE (14/12/2022, 335kb, PDF)

    Suggestions for Campaign for MNRE

    14/12/2022 14/01/2023 View (328 KB) Download
    Extension of date towards submission of comments on Draft Tender Document for Sea bed leasing for offshore wind energy Projects(25-11-2022, 35 kb, PDF)

    Extension of date towards submission of comments on Draft Tender Document for Sea bed leasing for offshore wind energy Projects

    25/11/2022 25/12/2022 View (34 KB) Download
    Selection for the post of Director (Finance), Solar Energy Corporation of India Limited (SECI), a Schedule ‘A’ CPSE (23-11-2022, 6MB, PDF)

    Selection for the post of Director (Finance), Solar Energy Corporation of India Limited (SECI), a Schedule ‘A’ CPSE

    23/11/2022 23/12/2022 View (6 MB) Download
    National Renewable Energy Internship Programme (22/11/2022, 53 KB, PDF) 22/11/2022 22/12/2022 View (34 KB) Download
    Draft Tender Document for Sea bed leasing for offshore wind energy Projects. (14-11-2022, 6 mb PDF)

    Draft Tender Document for Sea bed leasing for offshore wind energy Projects.

    14/11/2022 14/12/2022 View (6 MB) Download
    Administrative Approval and Scheme Guidelines for implementation of Waste to Energy Programme under the Umbrella scheme of National Bioenergy Programme for the duration of FY 2021-22 to FY 2025-26 (Phase-I)(03/11/2022, 1.3MB pdf)

    Administrative Approval and Scheme Guidelines for implementation of Waste to Energy Programme under the Umbrella scheme of National Bioenergy Programme for the duration of FY 2021-22 to FY 2025-26 (Phase-I)

    03/11/2022 03/12/2022 View (3 MB) Download
    Administrative approval for implementation of Biomass Programme under the Umbrella scheme of National Bioenergy Programme for duration of FY 2021-22 to 2025-26 (Phase-I) (03/11/2022,3.3MB pdf)

    Administrative approval for implementation of Biomass Programme under the Umbrella scheme of National Bioenergy Programme for duration of FY 2021-22 to 2025-26 (Phase-I)

    03/11/2022 03/12/2022 View (3 MB) Download
    Administrative approval for implementation of Biogas Programme under the Umbrella scheme of National Bio Energy Programme for FY 2021-22 to 2025- 26- (Phase-I) (03/11/2022,5.4MB pdf)

    Administrative approval for implementation of Biogas Programme under the Umbrella scheme of National Bio Energy Programme for FY 2021-22 to 2025- 26- (Phase-I)

    03/11/2022 03/12/2022 View (5 MB) Download
    LIST OF ANNEXURES FOR BIOGAS PROGRAMME(03/11/2022,5.5MB pdf)

    LIST OF ANNEXURES FOR BIOGAS PROGRAMME

    03/11/2022 03/12/2022 View (5 MB) Download
    Amendment in the ‘Guidelines for Tariff Based Competitive Bidding Process for procurement of power from Grid Connected Wind Solar Hybrid Projects’ issued dated 14.10.2020 (02/11/2022,80KB pdf)

    Amendment in the ‘Guidelines for Tariff Based Competitive Bidding Process for procurement of power from Grid Connected Wind Solar Hybrid Projects’ issued dated 14.10.2020

    02/11/2022 02/12/2022 View (78 KB) Download
    Recommendation of Search-Cum-Selection Committee for selection to the post of Director (Finance) in IREDA Ltd.(29/10/2022,263KB)

    Recommendation of Search-Cum-Selection Committee for selection to the post of Director (Finance) in IREDA Ltd

    29/10/2022 29/11/2022 View (258 KB) Download
    Amendment in provisions for tender for empanelment of vendors under Component-B of the PM-Kusum scheme(130KB pdf, 28/10/2022)

    Amendment in provisions for tender for empanelment of vendors under Component-B of the PM-Kusum scheme

    28/10/2022 28/11/2022 View (128 KB) Download
    National Training Programme on Renewable Energy Technologies: Recent advancements and Techno Economic aspects’ by SSS NIBE, Kapurthala (28 Nov – 1 Dec 2022) (25/10/2022, 534kb, PDF)

    National Training Programme on Renewable Energy Technologies: Recent advancements and Techno Economic aspects’ by SSS NIBE, Kapurthala (28 Nov – 1 Dec 2022)

    25/10/2022 25/11/2022 View (522 KB) Download
    Inviting comments on Draft National Repowering Policy for Wind Power Projects, 2022 (17/10/2022 1mb, PDF)

    Inviting comments on Draft National Repowering Policy for Wind Power Projects, 2022

    17/10/2022 17/11/2022 View (1,017 KB) Download
    Provisional List of Candidates Shortlisted for Interview for the post of Scientist ‘G’ at MNRE on Deputation basis. (17/10/2022 358 kb, PDF)

    Provisional List of Candidates Shortlisted for Interview for the post of Scientist ‘G’ at MNRE on Deputation basis.

    17/10/2022 17/11/2022 View (350 KB) Download
    Updated (27.09.2022) List-I under ALMM order for Solar PV Modules(13/10/2022,460 KB pdf)

    Updated (27.09.2022) List-I under ALMM order for Solar PV Modules

    13/10/2022 13/11/2022 View (449 KB) Download
    Partial amendment in resolution regarding National Renewable Energy Official Language Award (13/10/2022, 1.1 mb, PDF)

    Partial amendment in resolution regarding National Renewable Energy Official Language Award

    13/10/2022 13/11/2022 View (1 MB) Download
    National Repowering Policy for Wind Power Projects, 2022 (17.10.22 1 mb, PDF)

    National Repowering Policy for Wind Power Projects, 2022 (17.10.22 1 mb, PDF)

    11/10/2022 11/11/2022 View (1,017 KB) Download
    Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirements for Compulsory Registration) Order 2019 : Clarification –reg. (10-10-2022 5.2 mb, pdf)

    Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirements for Compulsory Registration) Order 2019 : Clarification –reg.

    10/10/2022 10/11/2022 View (5 MB) Download
    Extension of Rooftop Solar Programme Phase-II (06/10/2022. 2.8 mb, PDF)

    Extension of Rooftop Solar Programme Phase-II

    06/10/2022 06/11/2022 View (3 MB) Download
    Recommendation of the Committee for the appointment on Compassionate Ground in the Ministry. (04/10/2022 1.3 mb, PDF)

    Recommendation of the Committee for the appointment on Compassionate Ground in the Ministry.

    04/10/2022 04/11/2022 View (1 MB) Download
    Clarification on applicability of central financial assistance (CFA) available under Rooftop Solar (RTS) Programme Phase-II for solar systems installed under Virtual Net Metering (VNM) arrangement. (04/10/2022, 1.9 mb, PDF)

    Clarification on applicability of central financial assistance (CFA) available under Rooftop Solar (RTS) Programme Phase-II for solar systems installed under Virtual Net Metering (VNM) arrangement.

    04/10/2022 04/11/2022 View (2 MB) Download
    Scheme Guidelines for Implementation of the Production Linked Incentive Scheme (Tranche II) under ‘National Programme on High Efficiency Solar PV Modules’(30/09/2022,6.2MB)

    Scheme Guidelines for Implementation of the Production Linked Incentive Scheme (Tranche II) under ‘National Programme on High Efficiency Solar PV Modules’

    30/09/2022 30/10/2022 View (6 MB) Download