Programme/Scheme wise Cumulative Physical Progress as on March, 2024
Sector | Achievements (1st April 2023 – 31st March 2024) FY-2023-24 | Cumulative Achievements (as on 31.03.2024) |
---|---|---|
I. Installed RE Capacity (MW) | ||
Wind Power | 3253.39 | 45886.51 |
Solar Power* | 15033.26 | 81813.60 |
Small Hydro Power | 58.95 | 5003.25 |
Biomass (Bagasse) Cogeneration | 0.00 | 9433.56 |
Biomass(non-bagasse)Cogeneration | 107.34 | 921.79 |
Waste to Power | 1.60 | 249.74 |
Waste to Energy (off-grid) | 30.16 | 336.06 |
Total | 18484.70 | 143644.51 |
*Solar Power (Cumulative) : 81.81 GW
- Ground Mounted Solar Plant : 64.41 GW
- Grid Connected Solar Rooftop: 11.87 GW
- Hybrid Projects(Solar Component) : 2.57 GW
- Off-Grid Solar: 2.96 GW