Close

    Current Notices

    Filter Past Current Notices
    Current Notices
    Title Description Start Date End Date File
    Corrigendum 6: Supply, Installation and Commissioning of Integrated Floating buoy for mounting Offshore Lidar together with meteorological and oceanographic sensors (Wave, Current etc.,) at three locations (Zone C1, Zone B1 & Zone E2) at Gulf of Mannar off, Tamil Nadu Coast in India(23/12/2022,1.2 mb, PDF)

    Corrigendum 6: Supply, Installation and Commissioning of Integrated Floating buoy for mounting Offshore Lidar together with meteorological and oceanographic sensors (Wave, Current etc.,) at three locations (Zone C1, Zone B1 & Zone E2) at Gulf of Mannar off, Tamil Nadu Coast in India

    23/12/2022 23/01/2023 View (1 MB)
    CODE OF PRACTICE FOR DESIGN CONSTRUCTION INSTALLATION AND OPERATION OF BIOGAS (BIOMETHANE) PLANT (19/12/2022, 615kb, PDF )

    CODE OF PRACTICE FOR DESIGN CONSTRUCTION INSTALLATION AND OPERATION OF BIOGAS (BIOMETHANE) PLANT

    19/12/2022 19/01/2023 View (601 KB)
    Technical Specification of flexi-biogas plants(19/12/2022, 6.8mb, PDF)

    Technical Specification of flexi-biogas plants

    19/12/2022 19/01/2023 View (6 MB)
    Suggestions for Campaign for MNRE (14/12/2022, 335kb, PDF)

    Suggestions for Campaign for MNRE

    14/12/2022 14/01/2023 View (328 KB)
    Extension of date towards submission of comments on Draft Tender Document for Sea bed leasing for offshore wind energy Projects(25-11-2022, 35 kb, PDF)

    Extension of date towards submission of comments on Draft Tender Document for Sea bed leasing for offshore wind energy Projects

    25/11/2022 25/12/2022 View (34 KB)
    Selection for the post of Director (Finance), Solar Energy Corporation of India Limited (SECI), a Schedule ‘A’ CPSE (23-11-2022, 6MB, PDF)

    Selection for the post of Director (Finance), Solar Energy Corporation of India Limited (SECI), a Schedule ‘A’ CPSE

    23/11/2022 23/12/2022 View (6 MB)
    National Renewable Energy Internship Programme (22/11/2022, 53 KB, PDF) 22/11/2022 22/12/2022 View (34 KB)
    Draft Tender Document for Sea bed leasing for offshore wind energy Projects. (14-11-2022, 6 mb PDF)

    Draft Tender Document for Sea bed leasing for offshore wind energy Projects.

    14/11/2022 14/12/2022 View (6 MB)
    Administrative Approval and Scheme Guidelines for implementation of Waste to Energy Programme under the Umbrella scheme of National Bioenergy Programme for the duration of FY 2021-22 to FY 2025-26 (Phase-I)(03/11/2022, 1.3MB pdf)

    Administrative Approval and Scheme Guidelines for implementation of Waste to Energy Programme under the Umbrella scheme of National Bioenergy Programme for the duration of FY 2021-22 to FY 2025-26 (Phase-I)

    03/11/2022 03/12/2022 View (3 MB)
    Administrative approval for implementation of Biomass Programme under the Umbrella scheme of National Bioenergy Programme for duration of FY 2021-22 to 2025-26 (Phase-I) (03/11/2022,3.3MB pdf)

    Administrative approval for implementation of Biomass Programme under the Umbrella scheme of National Bioenergy Programme for duration of FY 2021-22 to 2025-26 (Phase-I)

    03/11/2022 03/12/2022 View (3 MB)
    Administrative approval for implementation of Biogas Programme under the Umbrella scheme of National Bio Energy Programme for FY 2021-22 to 2025- 26- (Phase-I) (03/11/2022,5.4MB pdf)

    Administrative approval for implementation of Biogas Programme under the Umbrella scheme of National Bio Energy Programme for FY 2021-22 to 2025- 26- (Phase-I)

    03/11/2022 03/12/2022 View (5 MB)
    LIST OF ANNEXURES FOR BIOGAS PROGRAMME(03/11/2022,5.5MB pdf)

    LIST OF ANNEXURES FOR BIOGAS PROGRAMME

    03/11/2022 03/12/2022 View (5 MB)
    Amendment in the ‘Guidelines for Tariff Based Competitive Bidding Process for procurement of power from Grid Connected Wind Solar Hybrid Projects’ issued dated 14.10.2020 (02/11/2022,80KB pdf)

    Amendment in the ‘Guidelines for Tariff Based Competitive Bidding Process for procurement of power from Grid Connected Wind Solar Hybrid Projects’ issued dated 14.10.2020

    02/11/2022 02/12/2022 View (78 KB)
    Recommendation of Search-Cum-Selection Committee for selection to the post of Director (Finance) in IREDA Ltd.(29/10/2022,263KB)

    Recommendation of Search-Cum-Selection Committee for selection to the post of Director (Finance) in IREDA Ltd

    29/10/2022 29/11/2022 View (258 KB)
    Amendment in provisions for tender for empanelment of vendors under Component-B of the PM-Kusum scheme(130KB pdf, 28/10/2022)

    Amendment in provisions for tender for empanelment of vendors under Component-B of the PM-Kusum scheme

    28/10/2022 28/11/2022 View (128 KB)
    National Training Programme on Renewable Energy Technologies: Recent advancements and Techno Economic aspects’ by SSS NIBE, Kapurthala (28 Nov – 1 Dec 2022) (25/10/2022, 534kb, PDF)

    National Training Programme on Renewable Energy Technologies: Recent advancements and Techno Economic aspects’ by SSS NIBE, Kapurthala (28 Nov – 1 Dec 2022)

    25/10/2022 25/11/2022 View (522 KB)
    Inviting comments on Draft National Repowering Policy for Wind Power Projects, 2022 (17/10/2022 1mb, PDF)

    Inviting comments on Draft National Repowering Policy for Wind Power Projects, 2022

    17/10/2022 17/11/2022 View (1,017 KB)
    Provisional List of Candidates Shortlisted for Interview for the post of Scientist ‘G’ at MNRE on Deputation basis. (17/10/2022 358 kb, PDF)

    Provisional List of Candidates Shortlisted for Interview for the post of Scientist ‘G’ at MNRE on Deputation basis.

    17/10/2022 17/11/2022 View (350 KB)
    Updated (27.09.2022) List-I under ALMM order for Solar PV Modules(13/10/2022,460 KB pdf)

    Updated (27.09.2022) List-I under ALMM order for Solar PV Modules

    13/10/2022 13/11/2022 View (449 KB)
    Partial amendment in resolution regarding National Renewable Energy Official Language Award (13/10/2022, 1.1 mb, PDF)

    Partial amendment in resolution regarding National Renewable Energy Official Language Award

    13/10/2022 13/11/2022 View (1 MB)
    National Repowering Policy for Wind Power Projects, 2022 (17.10.22 1 mb, PDF)

    National Repowering Policy for Wind Power Projects, 2022 (17.10.22 1 mb, PDF)

    11/10/2022 11/11/2022 View (1,017 KB)
    Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirements for Compulsory Registration) Order 2019 : Clarification –reg. (10-10-2022 5.2 mb, pdf)

    Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirements for Compulsory Registration) Order 2019 : Clarification –reg.

    10/10/2022 10/11/2022 View (5 MB)
    Extension of Rooftop Solar Programme Phase-II (06/10/2022. 2.8 mb, PDF)

    Extension of Rooftop Solar Programme Phase-II

    06/10/2022 06/11/2022 View (3 MB)
    Clarification on applicability of central financial assistance (CFA) available under Rooftop Solar (RTS) Programme Phase-II for solar systems installed under Virtual Net Metering (VNM) arrangement. (04/10/2022, 1.9 mb, PDF)

    Clarification on applicability of central financial assistance (CFA) available under Rooftop Solar (RTS) Programme Phase-II for solar systems installed under Virtual Net Metering (VNM) arrangement.

    04/10/2022 04/11/2022 View (2 MB)
    Recommendation of the Committee for the appointment on Compassionate Ground in the Ministry. (04/10/2022 1.3 mb, PDF)

    Recommendation of the Committee for the appointment on Compassionate Ground in the Ministry.

    04/10/2022 04/11/2022 View (1 MB)
    Scheme Guidelines for Implementation of the Production Linked Incentive Scheme (Tranche II) under ‘National Programme on High Efficiency Solar PV Modules’(30/09/2022,6.2MB)

    Scheme Guidelines for Implementation of the Production Linked Incentive Scheme (Tranche II) under ‘National Programme on High Efficiency Solar PV Modules’

    30/09/2022 30/10/2022 View (6 MB)
    Covering of imposition of Basic Customs Duty on import of solar PV cells and modules and hike in rates of GST, under ‘Change-in-Law’ (posted on: 27/09/2022, 776kb, PDF)

    Covering of imposition of Basic Customs Duty on import of solar PV cells and modules and hike in rates of GST, under ‘Change-in-Law’

    27/09/2022 27/10/2022 View (85 KB)
    Inviting applications for engagement of 2 Consultants in Sardar Swaran Singh National Institute of Bio-Energy(updated on 26/09/2022, 86 kb, PDF)

    Inviting applications for engagement of 2 Consultants in Sardar Swaran Singh National Institute of Bio-Energy

    26/09/2022 26/10/2022 View (85 KB)
    National Hands-on Training Programme on Biogas Technology and its Implementation’ by SSS NIBE, Kapurthala (17-21 Oct 2022) (Posted on: 22/09/2022 633kb, PDF)

    National Hands-on Training Programme on Biogas Technology and its Implementation’ by SSS NIBE, Kapurthala (17-21 Oct 2022)

    22/09/2022 22/10/2022 View (619 KB)
    QUALITY CONTROL MANUAL FOR GRID CONNECTED ROOFTOP SOLAR PV SYSTEM FINAL DRAFT(20.09.2022). (2.2 mb PDF)

    QUALITY CONTROL MANUAL FOR GRID CONNECTED ROOFTOP SOLAR PV SYSTEM FINAL DRAFT

    20/09/2022 20/10/2022 View (2 MB)