Close

    Ongoing Projects

    Solar PV

    Sl.No. Title of the Project Name of the PI and Institution Project Cost, MNRE Share (Rs. in Lakh) and Duration
    1 “National Centre for Photovoltaic Research and Education (NCPRE) – Phase III” Prof. B. G. Fernandes, Indian Institute of Technology (IIT) Bombay Project Cost- Rs. 4092 Lakhs
    MNRE Share- 100%
    Duration- 4 Years
    2 “National Primary Standard Facility for Solar Cell Calibration Dr. P. Prathap, CSIR-National Physical Laboratory, New Delhi Cost – Rs. 1828.26 Lakhs
    MNRE Share- 100%
    Duration- 3 Years
    3 “Flexible Perovskite Solar Cells and Intermediate Module Prof. Shaibal K. Sarkar, Indian Institute of Technology (IIT) Bombay Project Cost- Rs. 830 Lakhs
    MNRE Share- 100%
    Duration- 4 Years
    4 “Scale-up of Perovskite Tandem Solar Cells (Phase I)” Prof. Dinesh Kabra, Indian Institute of Technology (IIT) Bombay Project Cost- Rs. 8319.15 Lakhs
    MNRE Share- Rs. 4574.15 Lakhs
    Duration- 3 Years
    5 “Perovskite Solar Modules” Prof. Shaibal Sarkar, Indian Institute of Technology (IIT) Bombay Project Cost- Rs. 785 Lakhs
    MNRE Share- 100%
    Duration- 2 Years

    Wind Energy

    Sl.No. Title of the Project Name of the PI and Institution Project Cost, MNRE Share (Rs. in Lakh) and Duration
    1 Integrated Wind and Solar resource Assessment Director General, National Institute of Wind Energy (NIWE), Chennai Project cost = Rs. 1799 lakhs
    MNRE share = 100%
    Duration = 5 years
    2 Met-Ocean Measurements (Wind, Wave, Tide, Current, Water Level, etc.,) at Gulf of Khambhat and Gulf of Mannar Director General, National Institute of Wind Energy (NIWE), Chennai Project cost = Rs. 4464 lakhs
    MNRE share = 100%
    Duration = 5 years

    Small Hydro Power

    Sl.No. Title of the Project Name of the PI and Institution Project Cost, MNRE Share (Rs. in Lakh) and Duration
    1 Centre of Excellence titled “Research and development of Ultra Low head and Hydrokinetic Turbines and performance prediction of small hydro turbine models. Prof. Arun Kumar, Indian Institute of Technology (IIT), Roorkee Project cost = Rs. 1908 lakhs
    MNRE share = 100%
    Duration = 4 years

    Waste to Energy

    Sl.No. Title of the Project Name of the PI and Institution Project Cost, MNRE Share (Rs. in Lakh) and Duration
    1 Biomass Gasification through Plasma Pyrolysis Technology for Chemicals Production Prof. Vimal Kumar, Associate Professor,
    Indian Institute of Technology (IIT), Roorkee
    Project cost = Rs. 44.71 lakhs
    MNRE share = 100%
    Duration = 3 years
    2 Densification and co-firing of agro-waste for power generation through gasification Dr. Tapas Patra,
    Sardar Swaran Singh National Institute of Bio-Energy (SSS-NIBE), Kapurthala, Punjab
    Project cost = Rs. 40.45 lakhs
    MNRE share = 100%
    Duration = 2.5 years

    Hydrogen Energy

    Sl.No. Title of the Project Name of the PI and Institution Project Cost, MNRE Share (Rs. in Lakh) and Duration
    1 Green Hydrogen Mobility Projects at Leh Sh. DMR Panda,
    General Manager
    NTPC Ltd., Noida, U.P.
    Project Cost = Rs. 7227 lakh
    MNRE Share = Rs. 2598.5 lakhs
    Duration = 3 years
    2 Design & development of 20kW Low Temperature Polymer Electrolyte Membrane Fuel Cell (LTPEMFC) with high indigenous
    content
    Dr. R. Balaji
    ARCI-Centre for Fuel Cell Technology, Chennai
    Total Project Cost= Rs 2138.74 lakhs
    MNRE Share= Rs 1773.74 lakhs
    Duration= 3 years
    3 Setting Up of a Centre of Excellence on Hydrogen Energy at National Institute of Solar Energy Director General, National Institute of Solar Energy (NISE), Gurugram, Haryana Total Project Cost= Rs.1030.47 lakhs
    MNRE Share= 100%
    Duration= 3 years