Wind Schemes

Guidelines for Tariff Based Competitive Bidding Process for Procurement Power from Grid Connected Wind Power Projects

पवन विद्युत परियोजनाओं में सुधार (रिपावरिंग) के लिए नीति

ग्रिड संबद्ध पवन सौर हाइब्रिड परियोजनाओं से विद्युत की खरीद के लिए टैरिफ आधारित प्रतिस्पर्धी बोली प्रक्रिया हेतु दिशानिर्देश

Government have issued two sets of standard bidding guidelines for tariff based competitive bidding for wind and solar power projects respectively. It has also sanctioned a Scheme of 2500 MW of wind-solar hybrid power projects.

In pursuance of the OM No. 8(12)/2012/D(Coord) dated 15.10.2013 of the Ministry of Defence conveying the decision that the applications for grant/renewal of defence clearance for construction of power projects will be accepted through nodal Ministries (MNRE for renewable power projects), Guidelines are hereby issued for processing of applications in this Ministry for grant of clearance by the Ministry of Defence to wind power projects

The manufacturer(s) of the wind turbine whose prototype is to be installed, shall submit requisite information and documentation as per the prescribed format (to be provided by NIWE) to NIWE, Chennai for obtaining recommendation to permit installation of wind turbine prototype model for testing and grid synchronization / commissioning.

To ensure healthy and orderly growth of wind power sector in the country, Ministry issued Guidelines for wind power projects in July 1995, which were revised in June 1996

The undersigned is directed to refer to Secretary, Ministry of Environment, Forest and Climate Changes D.O. No. 15-7/2-15-WL (PT.1) GIB dated January, 2019 on the subject mentioned above wherein it is reported that electrocution with the transmission lines and collision with wind turbines of Wind Energy Farms are major causes of death of the Great Indian Bustard (GIB) birds in Rajasthan and Gujarat.

The undersigned is directed to refer to Ministry of Defence (MoD) OM No. 2(12)/2018/D(Air-ll) dated 151 August, 2018 (enclosed) and to convey that MoD has observed that Wind Turbine Generator (WTG) operators/ developers are not providing SCADA based remote control system for 'switching off of WTGs at nearest Air Force Station as specified in the NOC issued by Ministry of Defence for installation of WTGs around IAF aerodromes.

The undersigned is directed to refer to this Ministry's circular of even number dated 18.10.2018 and Ministry of Defence's OM No 2(12)/2018/D(Air-ll) dated 4th December, 2018 on subject mentioned

The Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Power Projects have been notified vide resolution No. 23/54/2017-R&R published in the Gazette of India (Extraordinary) (Part I-Sec. 1) on 8th December, 2017.

The objective of these Guidelines is to provide a framework for procurement of wind power through a transparent process of bidding including standardisation of the process and defining of roles and responsibilities of various stakeholders. These Guidelines aim to enable the Distribution Licensees to procure wind power at competitive rates in a cost effective manner.