Solar PV
| Sl.No. | Title of the Project | Name of the PI and Institution | Project Cost, MNRE Share (Rs. in Lakh) and Duration |
|---|---|---|---|
| 1 | “National Centre for Photovoltaic Research and Education (NCPRE) – Phase III” | Prof. B. G. Fernandes, Indian Institute of Technology (IIT) Bombay | Project Cost- Rs. 4092 Lakhs MNRE Share- 100% Duration- 4 Years |
| 2 | “National Primary Standard Facility for Solar Cell Calibration | Dr. P. Prathap, CSIR-National Physical Laboratory, New Delhi | Cost – Rs. 1828.26 Lakhs MNRE Share- 100% Duration- 3 Years |
| 3 | “Flexible Perovskite Solar Cells and Intermediate Module | Prof. Shaibal K. Sarkar, Indian Institute of Technology (IIT) Bombay | Project Cost- Rs. 830 Lakhs MNRE Share- 100% Duration- 4 Years |
| 4 | “Scale-up of Perovskite Tandem Solar Cells (Phase I)” | Prof. Dinesh Kabra, Indian Institute of Technology (IIT) Bombay | Project Cost- Rs. 8319.15 Lakhs MNRE Share- Rs. 4574.15 Lakhs Duration- 3 Years |
| 5 | “Perovskite Solar Modules” | Prof. Shaibal Sarkar, Indian Institute of Technology (IIT) Bombay | Project Cost- Rs. 785 Lakhs MNRE Share- 100% Duration- 2 Years |
Wind Energy
| Sl.No. | Title of the Project | Name of the PI and Institution | Project Cost, MNRE Share (Rs. in Lakh) and Duration |
|---|---|---|---|
| 1 | Integrated Wind and Solar resource Assessment | Director General, National Institute of Wind Energy (NIWE), Chennai | Project cost = Rs. 1799 lakhs MNRE share = 100% Duration = 5 years |
| 2 | Met-Ocean Measurements (Wind, Wave, Tide, Current, Water Level, etc.,) at Gulf of Khambhat and Gulf of Mannar | Director General, National Institute of Wind Energy (NIWE), Chennai | Project cost = Rs. 4464 lakhs MNRE share = 100% Duration = 5 years |
Small Hydro Power
| Sl.No. | Title of the Project | Name of the PI and Institution | Project Cost, MNRE Share (Rs. in Lakh) and Duration |
|---|---|---|---|
| 1 | Centre of Excellence titled “Research and development of Ultra Low head and Hydrokinetic Turbines and performance prediction of small hydro turbine models. | Prof. Arun Kumar, Indian Institute of Technology (IIT), Roorkee | Project cost = Rs. 1908 lakhs MNRE share = 100% Duration = 4 years |
Waste to Energy
| Sl.No. | Title of the Project | Name of the PI and Institution | Project Cost, MNRE Share (Rs. in Lakh) and Duration |
|---|---|---|---|
| 1 | Biomass Gasification through Plasma Pyrolysis Technology for Chemicals Production | Prof. Vimal Kumar, Associate Professor, Indian Institute of Technology (IIT), Roorkee |
Project cost = Rs. 44.71 lakhs MNRE share = 100% Duration = 3 years |
| 2 | Densification and co-firing of agro-waste for power generation through gasification | Dr. Tapas Patra, Sardar Swaran Singh National Institute of Bio-Energy (SSS-NIBE), Kapurthala, Punjab |
Project cost = Rs. 40.45 lakhs MNRE share = 100% Duration = 2.5 years |
Hydrogen Energy
| Sl.No. | Title of the Project | Name of the PI and Institution | Project Cost, MNRE Share (Rs. in Lakh) and Duration |
|---|---|---|---|
| 1 | Green Hydrogen Mobility Projects at Leh | Sh. DMR Panda, General Manager NTPC Ltd., Noida, U.P. |
Project Cost = Rs. 7227 lakh MNRE Share = Rs. 2598.5 lakhs Duration = 3 years |
| 2 | Design & development of 20kW Low Temperature Polymer Electrolyte Membrane Fuel Cell (LTPEMFC) with high indigenous content |
Dr. R. Balaji ARCI-Centre for Fuel Cell Technology, Chennai |
Total Project Cost= Rs 2138.74 lakhs MNRE Share= Rs 1773.74 lakhs Duration= 3 years |
| 3 | Setting Up of a Centre of Excellence on Hydrogen Energy at National Institute of Solar Energy | Director General, National Institute of Solar Energy (NISE), Gurugram, Haryana | Total Project Cost= Rs.1030.47 lakhs MNRE Share= 100% Duration= 3 years |