Wind Schemes & Guidelines
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Notice dated 11.12.2025 regarding Delay in Installation of SCADA based remote control system at IAF airfields | 11/12/2025 |
View(390 KB)
Accessible Version :
View(390 KB)
|
| Clarification with respect to revised Guidelines for installation of prototype wind turbine models | 06/08/2025 |
View(295 KB)
Accessible Version :
View(295 KB)
|
| Amendment to ‘Procedure for inclusion/ updating Wind Turbine Models in the Revised List of Models and Manufacturers of Wind Turbines (RLMM)’ | 31/07/2025 |
View(1 MB)
Accessible Version :
View(1 MB)
|
| Revised Guidelines for installation of prototype wind turbine models | 12/06/2025 |
View(1 MB)
Accessible Version :
View(1 MB)
|
| Scheme Guidelines for implementation of “VGF Scheme for Offshore Wind Energy Projects” | 11/09/2024 |
View(5 MB)
Accessible Version :
View(5 MB)
|
| Clarification to the ‘Guidelines for Development of Onshore Wind Power Projects’ and amendments | 23/08/2024 |
View(169 KB)
Accessible Version :
View(169 KB)
|
| Amendment to Guidelines for Development of Onshore Wind Power Projects | 04/07/2024 |
Accessible Version :
View(908 KB)
|
| Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Solar Hybrid Projects (21th August 2023) | 21/08/2023 |
View(3 MB)
Accessible Version :
View(3 MB)
|
| Offshore Wind Energy Lease Rules, 2023 | 21/08/2023 |
View(939 KB)
Accessible Version :
View(939 KB)
|
| Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Power Projects (26th July 2023) | 26/07/2023 |
View(3 MB)
Accessible Version :
View(3 MB)
|
| Introduction of the additional format (Annexure III) for utilization certifiacte in additon to the existing Annexure II , in respect of components/sub-components/parts/sub-parts imported /to be imported for manufacturing of WOEG, to be submitted along with the CCDC (Wind) Applications online (15-Sep-2021) | 15/09/2021 |
View(1 MB)
Accessible Version :
View(1 MB)
|
| Adherence to terms and conditions of NOC by WTG Operators – regarding (Dated 02.01.2019) | 02/01/2019 |
View(1 MB)
Accessible Version :
View(1 MB)
|
| Adherence to terms and conditions of NOC issued by Ministry of Defence to WTG Operators – Reg. (Dated 18.10.2018) | 18/10/2018 |
View(1 MB)
Accessible Version :
View(1 MB)
|
| Guidelines for forwarding of applications to Ministry of Defence for grant of clearance for construction of wind power projects |
View(23 KB)
Accessible Version :
View(23 KB)
|
|
| Amended Guidelines for installation of prototype wind turbine models. |
View(464 KB)
Accessible Version :
View(464 KB)
|
|
| Guidelines for Development of Onshore Wind Power Projects. |
View(135 KB)
Accessible Version :
View(135 KB)
|