Physical Progress (Achievements)

Printer-friendly version

Ministry of New & Renewable Energy

Programme/Scheme wise Physical Progress in 2019-20 & Cumulative upto April, 2019 
Sector FY- 2018-19 Cumulative
Achievements
Target 

Achievement (April 2019)

(as on 30.04.2019)
I.   GRID-INTERACTIVE POWER (CAPACITIES IN MWp)
Wind Power 3000.00 189.92 35815.88
Solar Power - Ground Mounted 7500.00 445.55 26829.87
Solar Power - Roof Top 1000.00 52.95 1849.34
Small Hydro Power 50.00 1.00 4594.15
Biomass (Bagasse) Cogeneration)  150.00 28.00 9131.50
Biomass (non-bagasse) Cogeneration)/Captive Power 100.00 0.00 674.81
Waste to Power 2.00 0.00 138.30
Total 11802.00 717.42 79033.85
II.  OFF-GRID/ CAPTIVE POWER    (CAPACITIES IN MWEQ)
Waste to Energy                    10.00 0.00 178.73
Biomass Gasifiers                                        1.00 0.00 163.37
SPV Systems  400.00 0.73 916.34
Total 411.00 0.73 1258.44
III.  OTHER RENEWABLE ENERGY SYSTEMS
Biogass Plants 86900.00 0.00 25561.00

State wise installed capacity of grid Interactive Renewable power as on(Posted on 20.05.2019)