Documents related to government notifications, orders, reports, guidelines and more appear here.
Documents
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Publication of the Model Service Agreement for “Electrolyser as a Service” (EaaS). | 24/07/2026 |
View
(3 MB)
Accessible Version :
View
(3 MB)
|
| Administrative approval for continuation of Renewable Energy Research and Technology Development Programme (RE-RTD) in the 16th Finance Cycle (FC) period from 2026–27 to 2030–31. | 20/07/2026 |
View
(8 MB)
Accessible Version :
View
(8 MB)
|
| Clarification with respect to Amendment to Revised Guidelines for installation of prototype wind turbine models | 15/07/2026 |
View
(198 KB)
Accessible Version :
View
(198 KB)
|
| Revised Guidelines for Installation of prototype wind turbine models | 25/06/2026 |
View
(403 KB)
Accessible Version :
View
(403 KB)
|
| Amendment in Guidelines for Viability Gap Funding for development of Battery Energy Storage System (BESS) funded through PSDF | 22/09/2025 |
View
(54 KB)
Accessible Version :
View
(54 KB)
|
| Viability Gap Funding (VGF) Scheme for development of Battery Energy Storage Systems (BESS) supported through Power System Development Fund (PSDF) | 09/06/2025 |
View
(3 MB)
Accessible Version :
View
(3 MB)
|
| Amendment in Operational Guidelines for viability Gap Funding Scheme for development of Battery Energy Storage System supported through Power System Development Fund (PSDF) | 04/08/2025 |
View
(73 KB)
Accessible Version :
View
(73 KB)
|
| Advisory on co-locating Energy Storage Systems with Solar Power Projects to enhance grid stability and cost efficiency | 18/02/2025 |
View
(707 KB)
Accessible Version :
View
(707 KB)
|
| Approved List of Models and Manufacturer for Wind Turbine Components ( ALMM-WTC) | 02/06/2026 |
View
(240 KB)
Accessible Version :
View
(240 KB)
|
| Application Fee for consideration for inclusion/updation in the Approved List of Models and Manufacturers – Wind (ALMM-Wind) and wind turbine component model in ALMM-WTC | 13/04/2026 |
View
(637 KB)
Accessible Version :
View
(637 KB)
|
| Call for proposal for skilling, up-skilling and re-skilling under the National Green Hydrogen Mission | 23/03/2026 |
View
(6 MB)
Accessible Version :
View
(6 MB)
|
| Approved List of Models and Maufacturers ( ALMM-Wind) | 02/04/2026 |
View
(443 KB)
Accessible Version :
View
(443 KB)
|
| Amendment to Procedure for inclusion-updating Wind Turbine Model in the Approved list of Models and Manufacturers of Wind Turbine | 16/02/2026 |
View
(426 KB)
Accessible Version :
View
(426 KB)
|
| MNRE’s Circular dated 04.02.2025 regarding Forged Steel Rings (for manufacture of WTGs) in reference to DoR’s Notification dated 01.02.2026 | 04/02/2026 |
View
(210 KB)
Accessible Version :
View
(210 KB)
|
| Notice dated 11.12.2025 regarding Delay in Installation of SCADA based remote control system at IAF airfields | 11/12/2025 |
View
(390 KB)
Accessible Version :
View
(390 KB)
|
| Amendment to ‘Standard Operating Procedure (SOP) for Approved List of Models and Manufacturers – Wind (ALMM-Wind) and Approved List of Models and Manufacturers – Wind Turbine Components (ALMM-WTC)’ | 01/12/2025 |
View
(246 KB)
Accessible Version :
View
(246 KB)
|
| Notification published in the Gazette of India regarding the constitution of the Hindi Salaahkar Samiti on August 01, 2025. | 01/08/2025 |
View
(719 KB)
Accessible Version :
View
(719 KB)
|
| Standard Operating Procedure (SOP) for Approved List of Models and Manufacturers – Wind (AL.MM-Wind) and Approved List of Models and Manufacturers – Wind Turbine Components (ALMM-WTC) | 29/10/2025 |
View
(902 KB)
Accessible Version :
View
(902 KB)
|
| India-Australia Green Hydrogen Taskforce – Recommendation Report | 30/10/2025 |
View
(3 MB)
Accessible Version :
View
(3 MB)
|
| Regarding closure of the National Renewable Energy Official Language Award Scheme by MNRE & its merger into Official Language Dept, Ministry of Home Affairs Official Language Gaurav Award Scheme | 10/01/2023 |
View
(282 KB)
Accessible Version :
View
(282 KB)
|
| Clarification to “Amendment to Procedure for inclusion/ updating Wind Turbine Models in the Revised List of Models and Manufacturers of Wind Turbines (RLMM)” dated 31.07.2025 | 04/09/2025 |
View
(264 KB)
Accessible Version :
View
(264 KB)
|
| Amendment to ‘procedure for inclusion/ updating Wind Turbine Model in the Revised List of Models and Manufacturers of Wind Turbines (RLMM) | 31/07/2025 |
View
(1 MB)
Accessible Version :
View
(1 MB)
|
| Clarification with respect to revised Guidelines for installation of prototype wind turbine models | 06/08/2025 |
View
(295 KB)
Accessible Version :
View
(295 KB)
|
| Scheme Guidelines for innovative methods/pathways/applications in green hydrogen sector not covered in previous Mission schemes | 04/08/2025 |
View
(4 MB)
Accessible Version :
View
(4 MB)
|
| Amendment to ‘Procedure for inclusion/ updating Wind Turbine Models in the Revised List of Models and Manufacturers of Wind Turbines (RLMM)’ | 31/07/2025 |
View
(1 MB)
Accessible Version :
View
(1 MB)
|
| Appointment Order of CVO, MNRE | 07/07/2025 |
View
(618 KB)
Accessible Version :
View
(618 KB)
|
| Revised Scheme Guidelines for setting up Hydrogen Valley Innovation Cluster (HVIC) and Green Hydrogen Hubs in India under National Green Hydrogen Mission (NGHM) | 27/06/2025 |
View
(8 MB)
Accessible Version :
View
(8 MB)
|
| Extension of Deadline – “Call for Proposals” on Innovation Challenge for Circularity in Renewable Energy Technologies – Batteries and Solar Photovoltaic | 11/07/2025 |
View
(276 KB)
Accessible Version :
View
(276 KB)
|
| Waiver of Inter-State Transmission Charges for Energy Storage Systems (ESS) | 10/06/2025 |
View
(546 KB)
Accessible Version :
View
(546 KB)
|
| Operational Guidelines for State Component under the scheme for Viability Gap Funding for development of Battery Energy Storage Systems | 11/10/2024 |
View
(914 KB)
Accessible Version :
View
(914 KB)
|