Physical Progress (Achievements)

Ministry of New & Renewable Energy

Programme/ Scheme wise Physical Progress in 2015-16 (During the month of July, 2015)
Sector FY- 2015-16 Cumulative
Achievements
Target  Achievement  (as on 31.07.2015)
I.   GRID-INTERACTIVE POWER (CAPACITIES IN MW)
Wind Power 2400.00 421.30 23864.91
Solar Power 1400.00 357.68 4101.68
Small Hydro Power 250.00 75.20 4130.55
Bio-Power (Biomass & Gasification and Bagasse Cogeneration) 400.00 0.00 4418.55
Waste to Power 10.00 12.00 127.08
Total 4460.00 866.18 36642.77
II.  OFF-GRID/ CAPTIVE POWER    (CAPACITIES IN MWEQ)
Waste to Energy                    10.00 0.50 146.51
Biomass(non-bagasse) Cogeneration 60.00 10.50 602.37
Biomass Gasifiers   
-Rural    
-Industrial                                     
2.00 0.00 17.95
6.00 0.00 152.05
Aero-Genrators/Hybrid systems 0.50 0.13 2.67
SPV Systems  50.00 0.00 234.35
Water mills/micro hydel 2.00 0.00 17.21
Total 130.50 11.13 1173.11
III.  OTHER RENEWABLE ENERGY SYSTEMS
Family Biogas Plants (numbers in lakh) 1.10 0.04 48.22
Solar Water Heating – Coll. Areas(million m2) - 0.00 8.90

 