Physical Progress (Achievements)

  

 
Ministry of New & Renewable Energy
Programme/ Scheme wise Physical Progress in 2015-16 (& during the month of March, 2016)
Sector FY- 2015-16 Cumulative Achievements
Target Achievement (as on 31.03.2016)
I.   GRID-INTERACTIVE POWER (CAPACITIES IN MW)
Wind Power 2400.00 3414.65 26769.05
Solar Power 1400.00 3018.80 6762.85
Small Hydro Power 250.00 218.60 4273.90
BioPower (Biomass & Gasification and Bagasse Cogeneration) 400.00 400.00 4831.33
Waste to Power 10.00 0.00 115.08
Total 4460.00 7052.05 42752.21
II.  OFF-GRID/ CAPTIVE POWER (CAPACITIES IN MWEQ)
Waste to Energy 10.00 14.13 160.16
Biomass(non-bagasse) Cogeneration 60.00 60.04 651.91
Biomass Gasifiers
-Rural
-Industrial
2.00 0.20 18.15
6.00 12.34 164.24
Aero-Genrators/Hybrid systems 0.50 0.16 2.69
SPV Systems 50.00 87.67 313.88
Water mills/micro hydel 2.00 1.50 18.71
Total 130.50 176.04 1329.74
III.  OTHER RENEWABLE ENERGY SYSTEMS
Family Biogas Plants (in Lakhs) 1.10 0.57 48.55
Solar Water Heating – Coll. Areas(million m2) 0.00 0.00 8.90

 