National Solar Mission Tenders and Current Schemes on Grid Solar Power

      

 Scheme Guidelines:

bullet

Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the National Solar Mission (NSM) (Posted on 16.03.2016)
 

bullet

Guidelines for Implementation of scheme for setting up of 2000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phase-II of the JNNSM (Posted on 04.08.2015)
 

bullet

DO letter of Shri Tarun Kapoor, JS (NSM) regarding the scheme for setting up of over 2,000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phase II of the JNNSM (Posted on 29.12.2015)
 

bullet

Guidelines for Selection of 3000 MW Grid – Connected Solar PV Power Projects under Batch-II Tranche-I “State Specific Bundling Scheme (Posted on 10.03.2015)
 

bullet

"Clarifications to Guidelines for Selection of 3000 MW Grid – Connected Solar PV Power Projects under NSM, Phase-II, Batch-II, Tranche-I “State Specific Bundling Scheme" (Posted on 08.09.2015)
 

bullet

"Amendments to Guidelines for Selection of 3000 MW Grid – Connected Solar PV Power Projects under NSM, Phase-II, Batch-II,  Tranche-I “State Specific Bundling Scheme" (Posted on 10.12.2015)
 

bullet

Amendment to MNRE's Guidelines for selection of 3000 MW Grid–Connected Solar PV Power Projects under NSM Phase-II, Batch-II, Tranche-I, State Specific Bundling Scheme. (Posted on 30.09.2016)
 

bullet

Office Memorandum - Guidelines for selection of 3000 MW Grid–Connected Solar PV Power Projects under NSM Phase-II, Batch-II, Tranche-I, State Specific Bundling Scheme – Revocation/Cancellation of Amendment dtd. 30.09.2016 (Posted on 04.11.2016)
 

bullet

Corrigendum in the Guidelines of the scheme for setting up of over 2,000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phase II of the JNNSM (Posted on 28.12.2015)
 

bullet

MNRE’s 3000 MW State Specific Bundling Scheme in Batch-II of National Solar Mission: Clarification in respect of part-commissioning, reg. (Posted on 30.10.2015)
 

bullet

Amendment in Implementation Support Agreement to be executed between SPD and RSDCL for 420 MW capacity solar projects in Bhadla Solar Park Phase-II (Posted on 07.12.2015)

 

Tenders: